Detector Scientist (EP-ATL-TRK-2026-116-GRAP)
2026-07-07
Geneva
European Organization for Nuclear Research
Job Description
---------------
During the ATLAS Phase-II upgrade in Long Shutdown 3, an all-silicon Inner Tracker (ITk) will be installed, consisting of four silicon strip layers and five hybrid …
---------------
During the ATLAS Phase-II upgrade in Long Shutdown 3, an all-silicon Inner Tracker (ITk) will be installed, consisting of four silicon strip layers and five hybrid …